Friday, August 25, 2006

Run- Khatib bonsu park connector - 8km

















"opps i still owe WS her book ..better returned to her soon" I remembered. Instead of returning the book i jio her for a pre-AHM tappering run on the new khatib bongsu park connector.

So we met up at the yishun stadium for the kickoff. Dump the stuff in the locker and did some warm-up before hitting the road.


















The map look pretty straight forward but there are a couple of traffic light which would break the running momentum and what worries me is that theres a lot of heavy human flow at the mrt station too. Not really a great park connector design if you ask me.















The yet under-construction fishing pond and seafood hut.














Our final destination the stadium. For some cool down before proceeding to dinner at mcdonald.

Distance : 8km
Timing : 42mins 32s
Pace : 5.25 mins/km

0 Comments:

Post a Comment

<< Home